GOVERN / NLO

National Logistics Observatory

Policy outcomes, infrastructure effectiveness, and the National Logistics Health Index — state by state, corridor by corridor.

AI Models Used on this page

Every insight on this page is traceable to a model and an agent. No black-box AI.

Model catalog
ModelPurposeConfLast refreshStatusExplain
Infrastructure Effectiveness Model

v2.0.0 · Policy

Outlay → realised LPI uplift.0.862026-05-19production Why
National Logistics Health Index

v5.1.0 · Policy

Composite LHI across 5 pillars.0.922026-05-26production Why
State Benchmarking Model

v3.4.0 · Policy

Per-state LPI + peer cohort percentiles.0.882026-05-23production Why
Rail Network Bottleneck Model

v2.5.0 · Rail Freight

Identify emerging bottleneck sections across the network.0.892026-05-26production Why

National Logistics Health Index · composite

India map · state-level performance

India · National Logistics Observatory

LPI score

GJMHKATNTGHRAPUPDLPBRJMPWBKLORCGJHBRASUK
Low
High

State Logistics Performance · ranked

RankStateLPI₹/t-kmOn-timeYoY
01

Gujarat

GJ

88
2.1494.1%
+2.1
02

Maharashtra

MH

86
2.2193.2%
+1.4
03

Karnataka

KA

82
2.3491.4%
+1.8
04

Tamil Nadu

TN

81
2.3890.8%
+0.9
05

Telangana

TG

80
2.4190.1%
+1.6
06

Haryana

HR

79
2.4689.7%
+0.7
07

Andhra Pradesh

AP

78
2.4889.0%
+1.1
08

Uttar Pradesh

UP

74
2.6287.2%
+0.4
09

Delhi

DL

73
2.6886.4%
+0.2
10

Punjab

PB

72
2.7185.8%
+0.6
11

Rajasthan

RJ

71
2.7485.1%
+0.8
12

Madhya Pradesh

MP

69
2.8484.0%
+0.3

Policy outcome tracking · LHI trajectory

National LHI · 12 months

7273747576

Logistics cost · % of GDP

1212131314

EXIM throughput · MT/mo

164175185196206

Corridor benchmarking · national corridors

DimensionCost idxTransit idxReliabilityUtilisation
Western DFC · JNPT–Dadri92889478
Eastern DFC · Ludhiana–Kolkata88849264
Golden Quadrilateral · Delhi–Mumbai80788892
Sagarmala · West Coast84829071
NER Multi-modal64627948

Investment effectiveness · infrastructure outlay → LPI uplift

Infrastructure investment · effectiveness

ProjectOutlaySpendLPI liftStatus

Western DFC Phase-3

MH

18,400 Cr
80%
3.1/4.2
On track

NER Multi-modal Hub

AS

6,200 Cr
45%
1.2/6.4
At risk

Sagarmala · Cochin upgrade

KL

4,800 Cr
92%
3.6/3.8
Complete

JNPT 4th terminal

MH

7,800 Cr
79%
2.1/2.4
On track

Patna Freight Corridor

BR

3,200 Cr
34%
0.4/5.6
Delayed

Bangalore Suburban

KA

2,800 Cr
64%
1.4/2.2
On track

Policy surfaces

Active policy signals

Related surfaces

Continue your investigation in adjacent modules.

Data provenance

all streams nominal

CoreSync

live

node/lane telemetry · 184 streams

TimeVault

indexed +3s

historical archive · 90d hot

Constraint Graph

rebuilt 02:14 ago

147 constraints · 1,284 vars

Insight Hub

live

agent observations + briefings

Ved Fabric

live

8 agents · 45 models active